Scaffold Shrink Wrap & Encapsulation Sheeting

Site Hoarding & Temporary Fencing

5options10technical drawings

Priced on enquiry

Priced against your scaffold dimensions and the system the job needs.

WhatsApp us

Tell us the size and where it is going.

About this product

  • What it is: Heavy-duty LDPE sheeting, either heat-shrunk drum-tight around a scaffold or fixed as…
  • Vs debris netting: Debris netting is a permeable mesh sized to catch a falling object while letting wind and…
  • Two systems: Shrink wrap is heat-welded into one continuous skin with no gaps.
  • Delivery: All 7 Emirates from our own yard.
  • Installation service: Supply only, or supplied and installed by our own crew rather than a subcontractor.
  • Ordering: Priced against your scaffold dimensions and whichever system the job needs, excluding 5%…
Read the full specification →
Delivered across all 7 Emirates

All 5 options

Every option on one list. Tap any row to ask about that one.

How much wrap for your scaffold?

Enter the faces you are closing in and get the number of rolls.

You need

  • Shrink wrap, 7 × 15 m, 300 micron16 rolls
  • Area being closed in1,440 m²

How that was worked out

  • walls: 30 m × 12 m × 4 faces = 1440 m²
  • 1440 m² ÷ 90 m² usable per roll = 16 → 16 rolls

Priced against your scaffold dimensions and the system the job needs.

What it is

Solid, heat-welded LDPE sheeting that fully encapsulates a scaffold or facade, for full weather and dust enclosure.

Specification

Everything published for this product. Anything not listed here is not published — ask and we will confirm it for the unit you are buying.

What it is
Heavy-duty LDPE sheeting, either heat-shrunk drum-tight around a scaffold or fixed as reinforced eyeletted panels (Monarflex-style), forming a continuous, largely sealed skin.
Vs debris netting
Debris netting is a permeable mesh sized to catch a falling object while letting wind and light through. Shrink wrap and encapsulation sheeting are solid — full dust, weather and sandstorm enclosure for facade work, sandblasting or painting where nothing should escape the scaffold.
Two systems
Shrink wrap is heat-welded into one continuous skin with no gaps. Traditional eyeletted sheeting is tied panel by panel, which is faster to strike and re-use but leaves the tie points as potential gaps.
Delivery
All 7 Emirates from our own yard. Sharjah and the northern emirates are usually same day on stocked lines; the rest of the country is one to three working days. The delivery charge depends on the emirate, the load and the offloading, and is confirmed in writing on the quotation rather than guessed at here.
Installation service
Supply only, or supplied and installed by our own crew rather than a subcontractor. Installation is quoted with the goods once we have the site conditions and the access, and is shown as its own line on the quotation.
Ordering
Priced against your scaffold dimensions and whichever system the job needs, excluding 5% VAT.
Scaffold Shrink Wrap & Encapsulation Sheeting

Technical Procurement & Ordering Guides

10 drawings covering every answer we need to price Scaffold Shrink Wrap & Encapsulation Sheeting — every figure comes from the price table above or from the published standard it is made to.

Shrink wrapA sealed skin

1 of 10

WhatsApp us

Send us the size, wall and length — or send the drawing and we will read it off.

Ready to price your scaffold shrink wrap & encapsulation sheeting?

Send us the size and the site. We quote the same day, and we deliver across all seven Emirates.

WhatsApp us

More in Site Hoarding & Temporary Fencing

See all 9