Fire water and fuel storage for factories.

Two-compartment fire water tanks, process water storage and bunded diesel — sized against your pump rating and delivered from Ajman, same day into Sharjah.

The UAE Fire and Life Safety Code requires fire water held in a tank with two compartments, or two interconnected tanks, with not less than 60 minutes of fire pump capacity. Industrial premises and storage occupancies above 3,600 m² fall inside it.

Why the 50/50 split is more than a code line

The Fire Code requirement is usually read as a box to tick. It is worth more than that once the tank is in service.

A single-compartment fire tank has to be drained to be cleaned, inspected or repaired — which means taking the fire system off-line, and that is the objection that stops most factories doing the maintenance at all. A two-compartment tank keeps one cell in service while the other is worked on: isolate one side, drain it, clean and disinfect it, return it to service, then start the other. The fire reserve is maintained throughout and production never stops for a tank.

If your existing tank is a single cell, that is the conversation worth having before your next inspection rather than after it.

  • The code also calls for drain arrangement, overflow connection, level indicators and a low level switch. Tell us what the specification asks for and we will confirm what the tank can be supplied configured for.

Panel tanks are how you get the split

Sectional GRP panel tanks are assembled from flat panels on site, which is what makes a compartment division possible in the first place, and what lets the footprint be built to the space you actually have rather than to a mould size.

  • Built to any footprint that meets the volume — useful when the plant room is long and low rather than square.
  • Delivered flat and assembled in position, so it will go through a standard doorway into a basement or an internal plant room.
  • Needs a level concrete plinth or steel beam base, prepared before delivery and designed for the filled weight — water alone is 1,000 kg per cubic metre.
  • Tell us the fire pump rating and the floor area available and we will work back to the capacity and the compartment split.

You are inside the same-day radius

Sharjah holds roughly 40% of all industrial establishments in the UAE across 21 industrial zones, with 2,800+ factories. Ajman has 1,688, and manufacturing plus construction is 35.2% of the emirate's entire GDP.

We are in Ajman Free Zone, which puts most of that inside a same-day run rather than a scheduled delivery. For a fire tank that fails an inspection, the difference between same-day and next-week is the whole job.

Process water, and the fuel beside it

The same plant usually needs more than fire reserve: process and cooling water storage, and diesel for the standby set. Both are on the published price list, and both come off the same delivery.

On diesel, bunded tanks carry their own secondary containment, so there is no concrete bund to design and pour inside a working plant.

What you order

Every line, priced in the open.

No quote gate to see a number. Click through to the tables and build the requisition yourself.

Questions

Straight answers.

Does a fire water tank need two compartments in the UAE?

The UAE Fire and Life Safety Code requires fire water to be held in a tank with two compartments, or two interconnected tanks, with not less than 60 minutes of fire pump capacity. Industrial premises and storage occupancies above 3,600 square metres fall inside the requirement.

Why does the two-compartment arrangement matter in practice?

Because one cell stays in service while the other is cleaned, inspected or repaired. A single-compartment tank has to be drained to be maintained, which takes the fire system off-line — and that is the reason most tanks never get maintained.

How do I size a fire water tank?

From the fire pump rating: the code sets a minimum of 60 minutes of pump capacity. Send us the rating and the floor area available and we will work back to the capacity and propose the compartment split.

Can a tank be built to fit an awkward plant room?

Yes — that is what sectional panel tanks are for. They are assembled from flat panels on site to any footprint that meets the volume, and they go through a standard doorway, so a long low plant room or a basement is not a problem.

Also supplying contractorslabour accommodationbuilding owners. The rules behind all of it are in the compliance guide.

Get in touch

Send your fire pump rating and the floor area you have available. We will size the tank, propose the compartment split, and quote it with delivery and VAT shown separately.

Published prices, written quotes with VAT and delivery shown separately, and delivery across all 7 Emirates.