A shipping container on a trailer leaving the yard
Where we deliver

Supplied and delivered in Abu Dhabi

Abu Dhabi is the longest regular run on our schedule and the one where the delivery is planned rather than squeezed in — a long haul to the island, further again to Al Ain, Ruwais or an ADNOC site inland. Loads are consolidated so the transport is paid once, which on a large order is usually the difference between a competitive price and a merely acceptable one.

Lead time
1–3 working days

On a scheduled run from the yard holding your item.

Offloading
Crane or forklift

Arranged with the delivery where your site has no plant of its own.

Coverage
All of Abu Dhabi

Including the industrial areas and free zones listed below.

Areas we deliver to in Abu Dhabi

  • Mussafah Industrial Area
  • ICAD I–III
  • KIZAD (Khalifa Industrial Zone)
  • Al Ain Industrial City
  • Ruwais

Anywhere else in Abu Dhabi is delivered on the same run — the list names the industrial areas and free zones we go to most, not a limit on where we will go.

What Abu Dhabi orders

Oil, gas and infrastructure work, where the specification is written down and has to be met: security fencing to a published standard, large-volume water storage, and site accommodation for remote compounds.

Every standard size carries a published price in AED on its own page. Anything built to your specification is quoted against the drawing.

Local rules

Water tank rules in Abu Dhabi

All stored potable water, with the interval set by what the tank is made of and where it sits. The instrument is named so you can check it yourself.

Code of Practice ED/R01/102, issued 2015 by the Regulation & Supervision Bureau
Department of Health / OSHAD — Abu Dhabi codes

This code dates from 2015 and the issuing body has since been absorbed into the Department of Energy. Confirm the current edition with DoE before writing it into a contract.

How often must the tank be cleaned?

It depends on the tank. Concrete and GRP tanks underground or at ground level, twice a year. Roof tanks, annually. Plastic, FRP and GI tanks, annually in either position.

Does the contractor need approval?

Yes. Contractor pre-qualification requires an ADDED licence, three years of demonstrated experience, documented compliance and a quality management system. Staff need certification in cleaning and disinfection, EHS, confined spaces and first aid, with supervisors adding life-saving and emergency management. Competency is reassessed every six months.

The full set of UAE rules, by Emirate and by topic, is on our compliance page.

Get in touch

Ready to get your quote?

Tell us the size, quantity and delivery emirate — we'll come back with pricing and availability.

Mon–Sat, 8:00 AM – 6:00 PM · +971 54 303 3119 (Operations Director) · +971 54 241 0599 (Managing Director)