A UAE construction site with a site office cabin and jersey barriers in place
Who we supply

Site water, site enclosure, site barriers.

One supplier for the tanks, the hoarding, the barriers, the cabins and the materials — so a site gets set up from a single order and a single delivery schedule.

Dubai issued 10,776 building permits in Q1 2026, up 12% year on year, with permitted built-up area up 48%. Every one of those sites needs water, welfare, enclosure and separation before it needs anything else.

One order instead of five

Most suppliers carry one line and leave the rest to you, which means five quotes, five deliveries and five people to chase when a date slips. We carry water storage, hoarding, fencing, barriers, cabins and building materials, and every price is published so you can build the requisition without waiting on a quote.

Send the whole site requirement in one message and it comes back as one quote with delivery and VAT shown separately. Contractor and bulk rates are better than list.

Sizing the site water

Site water is under-ordered more often than anything else on the list, because it is sized against the headcount on paper rather than against how often a tanker can actually reach the plot.

  • Allow roughly 40–50 litres per worker per day for welfare and washing, before any construction use — curing, dust suppression and wheel washing are on top of that and are usually the larger number.
  • Size against the tanker interval, not the daily draw. A tank that holds two days is a tank that stops the site the first time a delivery slips.
  • A moulded tank arrives whole and needs crane access on the day. If the plot is hoarded before the tank arrives, that access has to be planned or the tank will not get in.
  • Where the volume is past what a moulded tank can reach, or there is no crane access at all, the bolted modular steel tanks are carried in by hand and built in position.

At the end of the project

When the site closes, we buy the tanks, containers and cabins back, collect them, and credit them against the next project. That is where the refurbished stock on the price list comes from — and it is why a refurbished unit at the start of a job is a sensible buy rather than a compromise.

What you order

Every line, priced in the open.

Click through to the tables, build the requisition, and send it over for a written price.

Questions

Straight answers.

Can I get everything for a site from one supplier?

That is the point of the range. Water storage, site hoarding, jersey barriers, site offices and guard cabins, containers and building materials are all on one published price list, quoted together with delivery and VAT shown separately.

How much water storage does a site need?

Allow roughly 40–50 litres per worker per day for welfare, then add the construction draw — curing, dust suppression and wheel washing, which is usually the larger figure. Then size against how often a tanker can reach the plot rather than against the daily total, because a tank holding two days stops the site the first time a delivery slips.

Do you buy equipment back at the end of a project?

Yes. We buy back tanks, containers and cabins, collect them, and credit them against a replacement or the next project. It is also where our refurbished stock comes from.

Do you offer contractor rates?

Yes. The published prices are list prices; contractor and bulk rates are better. Send the full requirement rather than one line and it will be priced as a package.

Also supplying factorieslabour accommodationbuilding owners. The rules behind all of it are in the compliance guide.

Get in touch

Send your full site requirement in one message — what you need, the site emirate, and when you need it on the ground.

Published prices, written quotes with VAT and delivery shown separately, and delivery across all 7 Emirates.

Mon–Sat, 8:00 AM – 6:00 PM · +971 54 303 3119 (Operations Director) · +971 54 241 0599 (Managing Director)