Blue 20ft shipping container in the container yard
Who we supply

Site water, site fuel, site barriers.

One supplier for the tanks, the diesel, the barriers, the cabins and the materials — so a site gets set up from a single order and a single delivery schedule.

Dubai issued 10,776 building permits in Q1 2026, up 12% year on year, with permitted built-up area up 48%. Every one of those sites needs fuel, water, welfare and separation before it needs anything else.

One order instead of five

Most suppliers carry one line and leave the rest to you, which means five quotes, five deliveries and five people to chase when a date slips. We carry water storage, bunded diesel, barriers, cabins and building materials, and every price is published so you can build the requisition without waiting on a quote.

Send the whole site requirement in one message and it comes back as one quote with delivery and VAT shown separately. Contractor and bulk rates are better than list.

Sizing the fuel

Fuel is the line that gets under-sized most often, because it is sized against the generator rather than against the refuelling interval.

  • A 500 kVA generator burns roughly 100 litres an hour at load, so a 10,000 litre tank is about four days of continuous running before anyone thinks about a delivery.
  • Summer consumption runs 10–20% above winter on the same plant. A tank sized in January is tight in July.
  • Above roughly 13,000 gallons the tank diameter passes 2.6 m, which puts it outside standard load width and needs a transport permit. That is a lead time, not just a cost.
  • Bunded tanks carry their own containment, so there is no concrete bund to design, pour and cure before the tank can be commissioned — and the tank can move to the next site when this one closes.

Diesel and Civil Defence

Civil Defence approval is required to install fuel storage, and in Dubai the documented submission is a trade licence copy, tank drawings, a company application letter, a location map, and a tank inspection certificate from an approved company. Assembling that is usually what delays a tank, not the tank.

Tell us at enquiry stage that the tank is going into a Civil Defence submission and we will tell you exactly what documentation we can provide for the unit you are buying, and what has to come from elsewhere. We would rather say that up front than after the order.

  • Enforcement is not theoretical. Sharjah Civil Defence inspected 155 companies in the Al Saja'a industrial area in a single campaign, issuing violations for unauthorised tanks, improper storage practices and missing alarms, with further companies placed on grace periods.
  • If a tank is already on site and undocumented, it is on a clock. That is worth resolving before an inspection rather than during one.

At the end of the project

When the site closes, we buy the tanks, containers and cabins back, collect them, and credit them against the next project. That is where the refurbished stock on the price list comes from — and it is why a refurbished unit at the start of a job is a sensible buy rather than a compromise.

What you order

Every line, priced in the open.

No quote gate to see a number. Click through to the tables and build the requisition yourself.

Questions

Straight answers.

Can I get everything for a site from one supplier?

That is the point of the range. Water storage, bunded diesel, jersey barriers, site offices and guard cabins, containers and building materials are all on one published price list, quoted together with delivery and VAT shown separately.

What size diesel tank does a 500 kVA generator need?

A 500 kVA set burns roughly 100 litres an hour at load, so a 10,000 litre tank gives about four days of continuous running. Size against how often you want a fuel delivery rather than against the generator, and allow 10–20% more for summer.

Do you buy equipment back at the end of a project?

Yes. We buy back tanks, containers and cabins, collect them, and credit them against a replacement or the next project. It is also where our refurbished stock comes from.

Do you offer contractor rates?

Yes. The published prices are list prices; contractor and bulk rates are better. Send the full requirement rather than one line and it will be priced as a package.

Also supplying factorieslabour accommodationbuilding owners. The rules behind all of it are in the compliance guide.

Get in touch

Send your full site requirement in one message — what you need, the site emirate, and when you need it on the ground.

Published prices, written quotes with VAT and delivery shown separately, and delivery across all 7 Emirates.

Sat–Thu, 8:00 AM – 6:00 PM · +971 54 303 3119 (Operations) · +971 54 241 0599 (Commercial)