Completed inspection and compliance paperwork being handed over on site
Buying guide

Understanding modular bolted steel tanks

These are steel tanks, not GRP. Worth saying plainly, because most of the tanks on this site are composite and these are a different thing entirely. A bolted steel tank arrives as a pallet of curved galvanized panels and a box of bolts, and is built where it has to stand. That one fact decides almost everything else about it — where it can go, how big it can be, what it costs to move, and what has to be ready before it arrives. This explains the whole of it, from the panel in the crate to the water in the tank.

Buying guide

Understanding modular bolted steel tanks

These are steel tanks, not GRP. Worth saying plainly, because most of the tanks on this site are composite and these are a different thing entirely. A bolted steel tank arrives as a pallet of curved galvanized panels and a box of bolts, and is built where it has to stand. That one fact decides almost everything else about it — where it can go, how big it can be, what it costs to move, and what has to be ready before it arrives. This explains the whole of it, from the panel in the crate to the water in the tank.

What it is, and why it is built rather than delivered

A moulded GRP tank is made in a factory in one piece and craned into position. That works until the tank is bigger than the crane, the gate, or the doorway. Above about 20,000 gallons, or anywhere inside an existing building, it stops working entirely.

A modular bolted tank solves that by arriving in pieces. The shell is made of curved, galvanized steel panels, each one a manageable size, bolted to its neighbours through flanges with a rubber gasket sealing the joint. A tank is described by how many rings of panels it has — the courses — and how many panels are in each ring.

It is a complete steel vessel: a steel base, steel walls and a steel roof. The water is held by the steel itself, sealed at every joint with a rubber gasket. There is no plastic membrane and no PVC liner anywhere in it.

So a tank listed as eight courses of twelve panels is ninety-six panels bolted into a cylinder on site. Every one of them was carried in by hand or on a pallet truck.

The thing it does that nothing else does

It goes through a doorway. We have photographs of these tanks built inside finished basement plant rooms, under the ducting, with the lights already in. No one-piece tank of that volume could ever have been delivered into that room.

How the sizes work — diameter, height and courses

Capacity is set by two numbers: how wide the tank is and how tall. The standard range is built from courses 1,150 mm high, stacked between one and five high, on diameters from 1,894 mm to 11,364 mm. That gives 3.24 m³ at the smallest and 582.87 m³ at the largest, with ninety-three sizes in between.

The same volume can usually be reached more than one way. A short wide tank and a tall narrow one holding the same water are different products in practice: the wide one needs floor area and the tall one needs headroom and a stronger base. Tell us the space and we will pick the shape to suit it.

And the ninety-three standard sizes are a starting point, not a catalogue you have to choose from. The manufacturer builds to order, so a capacity that falls between two of them — or well beyond the largest — is engineered rather than rounded to the nearest listed size.

CoursesShell heightSmallestLargest
11,150 mm3.24 m³8.29 m³
22,300 mm6.48 m³233.15 m³
33,450 mm13.99 m³223.82 m³
44,600 mm18.65 m³350.24 m³
55,750 mm41.45 m³582.87 m³

This is the standard range, not the limit. Above it — and outside it — any capacity, diameter and height can be manufactured, engineered around the site. One worked example runs to 1,057 m³: 11,045 mm across and 11,040 mm tall, eight courses of twelve panels.

The steel, and why the bottom is thicker than the top

The shell is structural steel, grade S235JR, with stainless steel available where the stored liquid demands it. The panels are not all the same thickness: water pushes hardest at the bottom, so the lower courses are rolled from heavier plate than the upper ones. On a tall tank that difference is most of the cost.

It is also why a tall tank costs more per cubic metre than a short one of the same volume. You are not paying for more water, you are paying for the steel that holds the pressure at the base.

GradeUsed forWhy
Electro-galvanizedThe standard domestic rangeA zinc coating applied electrically. The economical choice, and what the 93 standard sizes are built from
Hot-dip galvanizedIndustrial and large engineered tanksThe steel is dipped in molten zinc, leaving a far heavier coating. What the big tanks are built from
Stainless steelWhere the stored liquid demands itSpecified when neither galvanizing nor a coating will survive the contents

Any of the three can be supplied with or without an additional covering material. The grade is chosen for the duty, not for the price.

  • Additional protective coatings and thermoplastic linings where the liquid or the environment requires them.
  • Potable water coating to WRAS / BS 6920 is offered as an option — ask for the approval reference before specifying it for drinking water.
  • There is no single wall thickness to quote for these tanks, and anyone who gives you one has not engineered it. It falls out of the diameter, the height, the water head and the design loads, and the manufacturer issues the thickness schedule with the technical submittal. The agricultural range is the exception: it is 1.5 mm throughout, because it is a wall ring rather than a pressure-retaining vessel.

How a bolted tank stays watertight

This is the question every engineer asks, and it is a fair one: a tank made of ninety-six separate pieces has a great many joints in it.

Every seam carries an EPDM rubber gasket, compressed between the panel flanges as the bolts are tightened. The bolts are high-tensile and galvanized like everything else, and they are torqued rather than simply done up. The seal is made by compression on the gasket, not by sealant smeared into a gap, which is why a properly built bolted tank does not weep and why the panels can be unbolted and the tank moved or extended later.

NBR gaskets replace EPDM where the stored liquid is petroleum-based or chemically aggressive.

Bolted steel tankAgricultural ring
StructureSteel base, walls and roofWall ring only — no base, no roof
What holds the waterThe steel itselfA PVC tarpaulin inside the ring
SealingRubber gasket at every panel jointNot applicable — the liner is the barrier
If the barrier failsA joint is re-torqued or a gasket replacedThe liner is replaced — the whole thing is drained
Service lifeThe life of the galvanizingThe life of the membrane, which is shorter
SuitsPotable, fire, process, plant rooms, industryIrrigation, livestock, open-air bulk water

The manufacturer's own position, in his words: the bolted tank works "without the need to use a plastic membrane or PVC liner, which has disadvantages". A liner is a consumable — it can be punctured, it degrades in sunlight, and when it goes the tank is out of service until it is replaced. Steel sealed on a gasket does not have that failure mode.

Roof, ladder and the fittings that come with it

A tank is more than a shell. The standard scope on an engineered tank includes the roof and everything needed to use and maintain it.

  • Self-supported conical roof — no internal columns standing in the water.
  • Roof access manhole, and a handrail around the roof edge.
  • External access ladder with a safety cage; stairs on the larger tanks.
  • Inlet, outlet, drain and overflow connections, and a vent pipe.
  • The complete bolting system, gaskets and anchor fasteners.

Options worth asking about

Lockable access hatch, wind resistance rings, seismic anchoring, cathodic protection, cold-weather insulation, lifting lugs, and project-specific connections. None of these are standard — they are specified when the site calls for them.

What has to be ready before the tank arrives

This is the part that catches people out, and it is worth being blunt about it. The tank is supplied; the ground it stands on is not.

A reinforced concrete foundation — a ring beam or a full slab, engineered to the tank's loaded weight and the ground conditions — must be cast, cured and level before anything is delivered. Civil works, excavation, the crane, the labour to build it, external pipework and any electrical work all sit outside the supply unless they are agreed in writing.

You are not left to work out what it has to carry. The manufacturer is an engineering company, and once the tank design is approved they issue the foundation loading and the foundation design requirements for it — the loads, the bearing arrangement and what the base has to do. Your civil contractor then designs and builds the reinforced concrete to those drawings and remains responsible for it. That split is the normal one on this kind of tank, and it means your engineer is working from real numbers rather than an assumption.

Price the civils before you price the tank

On a large tank the foundation is a serious cost in its own right. A quotation that covers the steel and forgets the concrete is not a quotation for a working tank. We will tell you what the base has to do; your civil contractor prices it.

Who bolts it together

A flat-pack tank has to be built by somebody, and it is a real trade rather than a day’s labouring: the courses go up in sequence, every gasket has to seat, and every bolt is torqued to a figure. A joint that is under-torqued weeps and a joint that is over-torqued crushes the gasket, and both are found by the water rather than by eye.

There are two ways to have it done, and the right one depends on whether you already have a competent crew on site.

ArrangementWhat it meansSuits
Supervisor onlyThe manufacturer sends a technical supervisor; your own crew does the lifting and bolting under his direction.A contractor with labour already on site, or a project where mobilising a foreign crew is not worth it
Full installation crewThe manufacturer’s own crew builds the tank, subject to the project location, scope and duration.A plant room handover, a fire tank on a programme, or anywhere the build has to be right first time

Either way it is quoted separately from the tank, against the size and the project — it is not a percentage and it is not included in the tank price. Ask for it at enquiry stage rather than after the order, because on a small tank it can be a meaningful share of the total.

  • Assembly runs about ten days for a large tank once the base is cured and level.
  • The base being ready is the gate. A crew standing beside uncured concrete is billable time.

Standards, approvals, and what we will not claim

The tanks are engineered to internationally recognised standards. AWWA D103 is the reference for bolted, factory-coated steel water tanks, covering design, materials, coatings, fabrication and testing. NFPA 22 applies where the duty is fire water storage. API 12B covers bolted production tanks, EN 1993-4-2 is the Eurocode for steel tank structures, and EN ISO 28765 covers the bolted tank design itself. The manufacturer holds ISO 9001, ISO 14001 and ISO 45001 management system certificates.

Each tank is engineered for its own site: capacity, wind speed, seismic conditions, soil, snow load where relevant and foundation conditions all feed the structural design, and the design and technical documentation are produced for submission to the local authority.

On UAE Civil Defence approval — the honest position

The manufacturer does not hold a separate DCD or ADCD product certificate, and has said so plainly rather than quoting a number they cannot support. For a fire water tank in the UAE that matters: the design is engineered to NFPA 22 and submitted for approval on the project, rather than arriving pre-approved. Talk to us before you specify one for fire duty, and we will tell you exactly where that stands on your job.

The agricultural tank is a different animal

One product in this range is not a closed tank at all, and it is worth understanding separately because it is far cheaper per cubic metre than anything else here.

An agricultural or irrigation tank is an open-topped ring of galvanized corrugated steel. There is no roof and there is no steel floor. The ring is bolted together on site, and a PVC membrane liner is fitted inside it — effectively a balloon that holds the water while the steel ring takes the load and keeps its shape. Water never touches a steel seam, so the whole question of gaskets and torqued joints does not arise.

That makes it the cheapest way to hold a large volume outdoors: irrigation and fertigation, livestock water, rainwater harvesting, or bulk water on a construction site.

Forty standard sizes run from 14 m³ to 995 m³. The ring is built from 0.85 m courses, so it comes 2.55 m tall in three courses or 3.40 m in four, and the diameter sets the volume — from 2.68 m across at the smallest to 22.29 m at the largest.

Be clear about what you are buying. It is deliberately simple equipment: a wall ring and a liner, no floor, no roof, thinner sheet than the bolted tanks. That simplicity is the whole point — it is why a 995 m³ agricultural tank costs a fraction of a closed tank of similar volume — but it is equipment for a field, not for a building.

The liner is also the part that will need replacing first. The bolted tanks above hold water in steel and seal it with a rubber gasket, so there is no membrane to puncture or to perish in the sun. Here the membrane is the only thing between the water and the ground, and it is a consumable.

Detail
SheetCarbon steel to EN 10025-2, 1.5 mm
GalvanizingZinc coating at 275 g/m²
Membrane650 g/m², PVC-coated fabric on both faces
FastenersM10 flanged bolts and nuts, grade 8.8
Cover95% jute netting
Heights2.55 m (3 courses) or 3.40 m (4 courses), 0.85 m per course

From the manufacturer's own specification sheet. The membrane is the water barrier and is replaceable; the steel ring is structural.

  • Open at the top — not for potable water, and it will collect dust and debris.
  • No steel base: it stands on level compacted ground or a concrete ring.
  • The membrane is the water barrier and is replaceable.
  • Access is by a ladder over the wall.

It is the basic option, and the manufacturer says so

This is a wall ring with a tarpaulin in it. There is no floor, the sheet is 1.5 mm, and the membrane is the only thing between the water and the ground. The manufacturer is explicit that it is not built to the standard of the bolted tanks above, and steers buyers to those wherever the duty is serious. For a field, a herd or a site water supply it is the right tool and unbeatable on price. For a plant room, potable water, fire reserve — or anywhere a leak would cost more than the tank — buy the closed bolted tank instead.

How long it takes, and what the order looks like

These are manufactured to order in Türkiye and shipped flat-pack. The sequence is fixed and worth understanding before you commit to a programme.

StageIndicative time
Engineering and manufactureAbout 35 days
Sea freight to Jebel AliAbout 14 days
Customs clearance and transport to siteAllow for it — it is not instant
Assembly on siteAbout 10 days once the base is ready

Indicative for a 500 m³ fire water tank, quoted by the manufacturer. Your own tank is confirmed when the engineering is finalised.

  • Confirm the requirement and the site conditions.
  • Technical and commercial offer, then a proforma invoice — which is where the warranty period is stated.
  • Engineering finalised and manufacture starts.
  • Packed for export as a flat-pack kit and shipped.
  • Clearance, delivery, assembly and handover.

What the warranty is

Two to three years in general, and that is the manufacturer’s own wording rather than a number we have rounded up. The exact period, and exactly what is covered on the coating, is stated against the specific product and the specific offer — so it is on the quotation you sign, not on this page.

We would rather print the general figure and let the offer be precise than advertise a headline period the paperwork does not support. If a warranty length matters to your specification, ask for it in writing before you order and it will be confirmed for the range you are buying.

Why the price is quoted and not printed

The water tank and shipping container ranges on this site carry a real published price in AED. Not this one, and the reason is honest rather than evasive.

The cost of one of these depends on the wall thickness the height demands, the coating the stored liquid demands, which accessories are fitted, and the freight, insurance, duty and clearance to land it in the UAE. Two tanks of identical volume can differ substantially on all four. A printed figure would be a figure we could not stand behind, which is the one thing this catalogue exists to avoid.

Send the volume, the location, what is being stored and the space available. You will get a real number against your actual job.

Questions

Straight answers.

What is a modular bolted steel tank?

A steel water tank delivered as flat-packed curved panels and bolted together where it will stand, rather than made in one piece and craned in. The shell is galvanized structural steel, every seam carries an EPDM rubber gasket compressed by high-tensile bolts, and the roof is self-supported with no internal columns.

Can it be built inside an existing building or basement?

Yes, and that is the main reason to choose one. The panels are carried in individually and bolted together in position, so the tank can be built in a finished plant room, a basement or any space a one-piece tank could never be delivered into. It needs a level reinforced concrete base and enough headroom to lift each course.

What sizes are available?

Ninety-three standard sizes from 3.24 m³ to 582.87 m³, on diameters from 1,894 mm to 11,364 mm and heights from 1,150 mm to 5,750 mm in 1,150 mm courses. That is the standard range rather than the limit: any capacity can be manufactured, engineered around the site. One worked example runs to 1,057 m³, 11,045 mm across and 11,040 mm tall. Tell us the volume and the space and we will size it.

How does a bolted tank stay watertight?

Each panel joint carries an EPDM rubber gasket which is compressed between the panel flanges as the high-tensile bolts are torqued. The seal comes from that compression, not from sealant filling a gap, which is why the tank does not weep and why it can be unbolted and moved or extended later.

Does the bolted steel tank need a plastic liner?

No. It is a complete steel vessel — steel base, steel walls, steel roof — and the water is held by the steel itself, with a rubber gasket sealing every panel joint. No membrane and no PVC liner are used. That matters, because a liner is a consumable: it can be punctured, it degrades in sunlight, and when it fails the tank is out of service until it is replaced. Only the agricultural ring tank uses a liner, and that is because it has no steel base or roof at all.

Who installs the tank?

Either your own crew under a technical supervisor sent by the manufacturer, or the manufacturer’s own full installation crew, depending on the project location, scope and duration. Installation is quoted separately from the tank against the size and the job — ask for it at enquiry stage, because on a smaller tank it is a meaningful share of the total.

How thick is the steel?

There is no single answer for the bolted tanks, and a supplier who gives you one has not engineered your tank. The thickness comes out of the diameter, the height, the water head and the design loads, and the manufacturer issues a thickness schedule with the technical submittal — which is also why the lower courses are heavier than the upper ones. The agricultural ring tank is the exception at 1.5 mm throughout.

What warranty do these tanks carry?

Two to three years in general. The exact period, and what is covered on the coating, is confirmed against the specific range and stated on the commercial offer rather than advertised here. Ask for it in writing before you order if it matters to your specification.

Do you supply the concrete foundation?

No. The reinforced concrete base, civil works, excavation, crane, installation labour, external pipework and electrical work are all excluded unless agreed in writing. We will tell you what the foundation has to carry and your civil contractor prices and casts it before delivery.

Are these tanks approved by UAE Civil Defence for fire water?

The manufacturer does not hold a separate DCD or ADCD product certificate and has confirmed that in writing rather than quoting a number they cannot support. The tanks are engineered to NFPA 22 for fire duty and to AWWA D103 generally, with the design and technical documentation produced for submission to the relevant authority on the project. Speak to us before specifying one for fire water and we will tell you where that stands on your job.

Can they hold drinking water?

Yes, with the appropriate potable-water coating. A WRAS / BS 6920 compliant coating system is offered as an option — ask us for the approval reference for the specific system before you specify it, and we will confirm it with the manufacturer.

How long does delivery take to the UAE?

Roughly 35 days to engineer and manufacture, about 14 days at sea to Jebel Ali, then customs clearance and transport to site, and about 10 days to assemble once the foundation is ready. Those are the manufacturer's indicative figures for a 500 m³ tank; your own programme is confirmed when the engineering is finalised.

Why is there no price on this page?

Because it would not be a price we could honour. The cost depends on the wall thickness the height demands, the coating the liquid demands, the accessories fitted, and the freight, duty and clearance to land it here. Send us the volume, the location, what is being stored and the space you have, and you will get a real figure against your actual job.

Are these GRP or fibreglass tanks?

Neither — they are steel. Galvanized structural steel panels bolted together, or stainless steel where the stored liquid demands it. We do sell GRP and fibreglass tanks, but they are a different range on a different page; nothing in this category is composite.

What is an agricultural or irrigation tank?

A galvanized steel wall ring with a PVC tarpaulin inside it to hold the water — the basic, lowest-cost product in this range. There is no roof and no steel floor: the ring holds the shape and the liner holds the water, sitting directly on prepared ground. Forty standard sizes from 14 m³ to 995 m³, in 0.85 m courses giving a 2.55 m or 3.40 m wall. The sheet is 1.5 mm carbon steel to EN 10025-2 galvanized at 275 g/m², and the membrane is 650 g/m² PVC-coated fabric. It is the cheapest way to store a large volume for irrigation, livestock, fertigation or site water. It is not built to the standard of the bolted tanks and is not suitable for drinking water, fire reserve, plant rooms, or anywhere a leak would matter — for those, buy the closed bolted tank.

Which standards are these tanks built to?

AWWA D103 for bolted factory-coated steel water tanks, NFPA 22 where the duty is fire water, API 12B for bolted production tanks, EN 1993-4-2 — the Eurocode for steel tank structures — and EN ISO 28765 for the bolted tank design. The manufacturer also holds ISO 9001, ISO 14001 and ISO 45001.

What is the tank made of?

Steel, not GRP. Structural steel to grade S235JR: electro-galvanized on the standard domestic range, which is the economical choice, and hot-dip galvanized on the large industrial tanks, which leaves a far heavier zinc coating. Stainless steel is available where the stored liquid requires it, and any of the three can be supplied with or without an additional covering material. Gaskets are EPDM for water, or NBR for petroleum-based and chemically aggressive liquids. Bolts, nuts, washers and accessories are galvanized throughout.

Now the prices

Modular Bolted Steel Tanks

Flat-packed steel tanks bolted together on site — carried through a doorway and built where a one-piece tank could never be delivered. 3 m³ to 580 m³ as standard, larger engineered to the project.

Get in touch

Ready to get your quote?

Tell us the size, quantity and delivery emirate — we'll come back with pricing and availability.

Mon–Sat, 8:00 AM – 6:00 PM · +971 54 303 3119 (Operations Director) · +971 54 241 0599 (Managing Director)