6 products in Civil Works & Site Fixings
Swipe to find yours, then open it for lines, prices and drawings.
Where this is used.
The jobs civil works & site fixings actually do. If yours is not on the list, it is still worth asking — most of what we supply ends up somewhere nobody wrote down.
Roads, yards & hardstanding
Interlock pavers at 60 mm for footways and light traffic, 80 mm where a loaded vehicle runs over them, with kerb and bedding sand off the same delivery.
Formwork & concrete works
Film-faced shuttering plywood for a finish that comes off the pour clean, commercial ply for the rough carpentry around it.
Fixing into concrete
Wedge anchors where the load is static and the concrete is sound; chemical anchors where it is cracked, close to an edge, or the load is dynamic.
Steel-to-steel and sheet fixing
Self-drilling Tek screws through sheet into purlin, and hex bolt sets where the joint has to be taken apart again.
Landscaping & external works
Coloured pavers, kerbs and edging for villa compounds, hotel grounds and the external works that get signed off last and looked at first.
What we can put in front of your engineer.
Ask for any of it against a specific size and you will get it the same working day.
- Paver dimensions, thickness and how many pieces cover a square metre
- Anchor load tables, and the edge distance and embedment each size needs
- Plywood sheet sizes, thickness and how many pours a film-faced sheet is good for
We do not publish downloadable datasheets. Where a standard or a certificate is written into your specification, ask us against the specific unit — we will either produce the supplier documentation or tell you plainly that we cannot, rather than leave you to find out at inspection.
What you get with the price.
Stock on the ground
Same-day into Sharjah and the northern emirates for what is in the yard, one to three working days elsewhere.
New and refurbished
Both grades priced side by side on every line, so the budget decision is yours to make, not ours to steer.
Delivered and offloaded
Our own transport across all 7 Emirates, with crane or forklift offloading arranged and quoted before you commit.
Checked before it leaves
Refurbished units are cleaned, repaired and inspected in our own yard rather than shipped on as found.
Bulk and project supply
Send the full requirement rather than line by line — contractor and bulk rates are better than list.
Straight answers
If we cannot meet a specification or evidence a standard, we say so at enquiry stage rather than after the order.
Plywood, pavers and kerbs
Four unrelated ranges that share one thing: they are all bought by the quantity a drawing implies rather than by the piece. This is how to turn an area or a length on a plan into an order.